top of page
amitkatke_82927_worker_remodeling_floor_for_metallic_concrete_c_09b89c37-84b6-48ad-9128-62

INSTALLATION

Fort Worth – Dallas – Arlington – All North Texas

The installation process starts with determining the type of concrete you have, and what condition it is currently in. Depending on its hardness, moisture content and structural condition will determine how we handle the most important step in the process which is concrete preparation.

After four to six hours you can confidently walk on your new floor coating and after 24 hours you can park and drive on the coating. We know you will completely love your new concrete coated floor!

STEP 1 - PREPARATION

Preparation includes shot blasting and/or diamond grinding. Dust is minimized by having all grinders hooked up to vacuum systems.

STEP 2 - CONCRETE RECONSTRUCTION

American Concrete Coatings' menders and fillers are used to fix pits and cracks before the process begins.

STEP 3 - BASE COAT

American Concrete Coatings' 100% solids, self-priming pure polyurea basecoat is mixed and applied.

STEP 4 - BROADCASTING THE CHIP

Immediately after the basecoat application, the chip is generously broadcast by hand, providing both color and texture to the floor.

STEP 5 - SCRAPING THE CHIP

Once the basecoat is fully cured the floor is scraped and vacuumed to remove any loose or vertical standing flakes.

STEP 6 - CLEAR COAT

The final step is to roll out the UV stable polyaspartic clear coat. The top coat is chemical, rust and abrasion resistant. It is also antimicrobial and antibacterial

bottom of page